Important note regarding June 2022 England Building Regulations Updates
Which set of specs should I use?
The Amendment Regulations and accompanying Approved Documents L: Volumes 1 and 2 come into force on 15 June 2022 in England. However, the changes will not apply in relation to building work where a building notice or an initial notice has been given to, or full plans deposited with, a local authority before 15 June 2022 provided that the building work is started before 15 June 2023.
Therefore, where plans are to be deposited with a local authority before 15 June 2022 and building work starting before 15 June 2023, use the Specs with page heading 'Pre-June 2022'.
Where plans are to be submitted to Building Control on/after 15 June 2022 or building work is to start on/after 15 June 2023, use the specs with page heading 'Specs for June 2022', where available.
Terms and Conditions
These building notes apply only to Single or 2-Storey House Extensions.
It is your responsibility to ensure that the notes are suitable for use in your particular situation.
Guidance
To compile a House Extension specification, go through the sections on the left, starting from the top, and add notes from the relevant subsections as you proceed.
Important: When compiling a spec, Save it at Regular Intervals (e.g. 15 minutes) to safeguard your House Extension Specification.
See under the Support Menu for Tutorials and Videos on Using the Website.